Agent Migration Vertical
🔄 Managed Agent Migration
Your current automation is held together with duct tape. You know what you want to move to — but the migration feels risky and the window to break production is zero. SideGuy manages the move.
$300–$1,000 · Scoped Per Migration
Who This Is For
If This Sounds Like You, This Is For You
FounderLegacy Zapier or Make zaps that need to move to n8n or a Claude agent
OperatorManual ops process that works but doesn't scale — ready to automate properly
BuilderWorking automation that needs a cleaner, more maintainable architecture
SMB OwnerPaying too much for automation tools that are doing simple things badly
What's Included
One Engagement. Leave Unblocked.
- Current workflow audit — map exactly what exists and what it does
- Migration plan with rollback path at every stage
- New architecture built and tested in parallel before cutover
- Data and state migration — nothing lost in the move
- Cutover executed with zero production downtime
- Old workflow retired cleanly — no zombie zaps running in parallel
- New workflow documented and handed off with runbook
- Two weeks of post-migration text support
How It Works
Text → Intake → Session → Template → Support
1
Text PJ with what you're migrating from and toCurrent stack, destination stack, and what's non-negotiable about the behavior.
2
Migration audit and scopingPJ maps the current workflow completely and identifies migration risk points before quoting.
3
Parallel buildNew workflow built and tested against real data before anything is cut over.
4
Staged cutoverMigration executed in stages with rollback available at every step. No big-bang switches.
5
Handoff and two-week supportFull runbook, architecture doc, and two weeks of text support while you stabilize on the new stack.
Why This Works
The Rail Is Powerful. The Layer Is What Gets You Moving.
Most automation migrations fail because they're done as a big-bang switch with no rollback. SideGuy runs every migration in parallel — new and old both live until the new one is proven.
The Rail
Zapier · Make · Legacy Scripts · Manual Ops
What you're moving off. Often works but costs too much, breaks quietly, or can't scale without a full rebuild.
SideGuy Layer
Audit · Parallel Build · Staged Cutover · Runbook
Migration done in parallel with rollback at every stage. Nothing breaks in production.
Ready to Move Off Legacy Automation?
$300–$1,000 scoped per migration. Audit → parallel build → staged cutover → runbook. Nothing breaks in production.
Text PJ → Start Migration Scoping
San Diego based
Text-first support
Same-week sessions
No ticket queue